Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
HRA TEGUH SDN BHD/ SHIMITSU CORPORATION | SITE CLEARANCE, EARTHWORKS FOR SEWAGE TREATMENT PLANT PROJECT (PHASE 1: PACKAGE 1) AT SOUTHERN KLANG VALLEY CSTF | 7,165,700 | 24-02-2004 TO 10-01-2005 |
MAPO INDUSTRIES SDN BHD/ KH CONSULTANTS | CADANGAN MEMBINA 3 BUAH KILANG PLASTIK DAN SEBUAH PEJABAT 3 TINGKAT DI ATAS PT.67144, LOT 10, JALAN SUNGAI PINANG 5/2, TAMAN PERINDUSTRIAN PULAU INDAH, MUKIM KLANG, SELANGOR DARUL EHSAN | 6,473,614 | 01-03-2004 TO 15-11-2004 |
ASIA KREATIF SDN BHD/ SETIA RUNDING SDN BHD | PILING AND PILECAP WORKS FOR CADANGAN MEMBINA MEMBANGUN FASA 1A DAN 1B UNTUK PEMBANGUNAN 2 BLOK 14 TINGKAT RUMAH PANGSA KOS SEDERHANA DAN 1 BANGUNAN KEMUDAHAN AWAM & TEMPAT LETAK KERETA 4 TINGKAT YANG MENGANDUNGI 340 UNIT RUMAH PANGSA KOS SEDERHANA DAN 44 UNIT KEDAI/ PEJABAT DI ATAS LOT 254 DAN 255, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN | 2,342,000 | 15-09-2004 TO 14-12-2004 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
DUTA RASMI SDN BHD/ PERUNDING BARAM SDN BHD | SITE CLEARANCE AND EARTHWORKS FOR CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS SEBAHAGIAN LOT PT9135 - PT3153, DI RANCANGAN REVOLUSI HIJAU PERINGKAT 2, (RRHP II), BUKIT CERAKAH, MUKIM IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN (1260 ACRES) JOINT VENTURE WITH KUMPULAN JAYA PUTERA SDN BHD | 23,380,710 | 12-12-2002 TO 31-03-2005 |
TISMA STEEL SERVICE CENTRE SDN BHD/ KH CONSULTANTS | CADANGAN MEMBINA TAMBAHAN KILANG KEPADA KILANG YANG SEDIADA DI ATAS LOT 6488, LORONG SUNGAI PULOH , MUKIM KAPAR, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TISMA STEEL SERVICE CENTRE SDN BHD | 2,600,000 | 29-10-2004 TO 31-03-2005 |
HRA TEGUH SDN BHD/ SHIMITSU CORPORATION | PILING WORKS 400MM & 500MM DIAMTER SPUN PILES FOR SEWAGE TREATMENT PLANT PROJECTS (PHASE 1: PACKAGE 1) AT SOUTHERN KLANG VALLEY CSTF | 2,924,736.9 | 17-01-2005 TO 17-05-2005 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
ASIA KREATIF SDN BHD/ AEON ARKITEK | MAIN BUILDING WORKS FOR "CADANGAN MEMBANGUNKAN FASA 1A DAN 1B UNTUK PEMBANGUNAN 2 BLOK 14 TINGKAT RUMAH PANGSA KOS SEDERHANA DAN 1 BLOK BANGUNAN KEMUDAHAN AWAM & TEMPAT LETAK KERETA 4 TINGKAT YANG MENGANDUNGI 340 UNIT RUMAH PANGSA KOS SEDERHANA DAN 44 UNIT KEDAI/PEJABAT DI ATAS 254 DAN 255, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN | 35,619,540 | 18-12-2004 TO 30-11-2006 |
HRA TEGUH SDN BHD/ MINCONSULT SDN BHD | SPUN PILES PILING WORK FOR TUNKU JAAFAR POWER STATION REHABILITATION PROJECT PHASE 2 (750MW COMBINED CYCLE POWER PLANT) | 7,576,000 | 18-01-2006 TO 31-12-2006 |
HRA TEGUH SDN BHD/ TAISEI CORPORATIO/ MINCONSULT SDN BHD | PILING WORKS FOR BUILDING & CIVIL WORKS FOR JIMAH 700MW X 2 UNITS COAL FIRED THERMAL POWER PLANT PROJECT AT KUALA LIKUT, MUKIM JIMAH, DISTRICT OF PORT DICKSON, NEGERI SEMBILAN DARUL KHUSUS (SUPPLY PLANTS & MACHINERIES, LABOURS AND MANAGEMENT) | 14,730,300 | 25-01-2006 TO 31-07-2007 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
REALIS SDN BHD/ JKR SEREMBAN | PILING WORKS FOR PROJECT MENAIKTARAF JALAN SEREMBAN KE KUALA PILAH, NEGERI SEMBILAN, NEGERI SEMBILAN-BRIGE AT SIMPANG SENAW WANG KE BUKIT PUTUS | 457,070 | 26-06-2007 TO 31-10-2007 |
USAHA HARTAMAS SDN BHD/ GUE & PARTNES ENGINEERING SDN BHD | CADANGAN PEMBANGUNAN YANG MENGANDUNGI 1 TINGKAT TEMPAT LETAK KERETA ARAS BASEMENT, 1 PODIUM PERDAGANGAN (2 TINGKAT) BERSERTA DENGAN TEMPAT LETAK KERETA (6 TINGKAT) DAN 2 BLOK SERVIS APARTMENT (BLOK A - MUKIM SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL EHSAN. (EARTH WORKS, ROCK BLASTING, FOUNDATION, BASEMENT, PILING WORKS AND PILES CAPS) | 7,550,000 | 07-08-2007 TO 15-04-2008 |
BANDAR UTAMA BUDDHIST SOCIETY/ C.T. ARCHITECT/ JURUTERA PERUNDING TEGUH | PILING AND PILE CAPS AND RETAINING WALLS FOR CADANGAN MEMBINA SEBUAH PUSAT KEBUDAYAAN AGAMA BUDDHA 2 TINGKAT DAN 1 TINGKAT BAWAH TANAH DI ATAS LOT PT 127 (SEBAHAGIAN LOT 30133) BANDAR PETALING JAYA, SEKSYEN 39, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN BANDAR UTAMA BUDDHIST SOCIETY | 721,833.7 | 16-09-2007 TO 15-03-2008 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
ELECTRON BEAM SDN BHD/ EDP CONSULTING GROUP SDN BHD | PILING WORKS FOR CADANGAN PEMBINAAN SEBUAH GUDANG DI ATAS LOT P.T. 121634 PULAU INDAH INDUSTRIAL PARK | 2,115,645 | 28-02-2008 TO 30-04-2008 |
KONG LONG HUAT CHEMICAL SDN BHD/ KH CONSULTANT | CADANGAN PEMBINAAN SEBUAH GUDANG SETINGKAT BERSERTA PEJABAT 2 TINGKAT, SEBUAH GUDANG SETINGKAT, SEBUAH PEJABAT DAN MAKMAL SETINGKAT, SEBUAH RUMAH PAM DAN SEBUAH KEBUK SAMPAH DI ATAS PLO 574, JALAN KELULI 12, ZON 12A, KAWASAN PERINDUSTRIAN PASIR GUDANG, MUKIM PLENTONG, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM | 5,980,000 | 19-05-2008 TO 19-07-2009 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
SETIA HARUMAN SDN BHD/ VIRGO JURUTERA PERUNDING | PILING PILECAPS AND STUMPS FOR PROPOSED 4/5 STOREY SHOP OFFICES ON PART ON PT 12185, CENTRAL BUSINESS DISTRICT (CBD 2), CYBERJAYA FLAGSHIP ZONE, CYBERJAYA | 5,096,418.2 | 02-02-2009 TO 24-05-2009 |
HARP SOON CORPORATION SDN BHD/ PERUNDING HARON RAKAN-RAKAN SDN BHD | PROPOSED PILING WORK FOR CADANGAN PEMBANGUNAN PANGSAPURI | ||
PERANGINANYANG MENGANDUNGI :- | |||
a) 1 BLOK PANGSAPURI 13 TINGKAT - 263 YUNIT (BLOK A) | 858,326 | 03-08-2009 TO 03-10-2009 | |
b) 1 BLOK PANGSAPURI 12 TINGKAT - 255 YUNIT (BLOK B) | 838,326 | 17-11-2009 TO 16-02-2010 | |
DI ATAS LOT 45, MUKIM BUKIT KATIL DAERAH MELAKA TENGAH, MELAKA | |||
BANDARAYA BERSEJARAH UNTUK TETUAN HARP SOON CORPORATION SDN BHD |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
UNI-INTEGRATED CONSTRUCTION SDN BHD/ GCU CONSULTANTS SDN BHD | R.C PILING MEMBINA DAN MENYIAPKAN POLITEKNIK BANTING, SELANGOR - PILING WORKS (PACKAGE 2A1) | 6,386,977.52 | 12-03-2010 TO 11-07-2010 |
UNI-INTEGRATED CONSTRUCTION SDN BHD/GCU CONSULTANTS SDN BHD | R.C PILING MEMBINA MENYIAPKAN POLITEKNIK BANTING, SELANGOR- PAKEJ 2 (VARIATION ORDER NO. 1 - PILING WORKS FOR SEWERAGE TREATMENT PLANT) | 940,473.85 | 03-11-2010 TO 31-01-2011 |
COPOLY SDN BHD/ NESA ARKITEK | R.C PILING CADANGAN MEMBINA 2 UNIT KILANG BERKEMBAR SATU TINGKAT DAN PEJABAT SATU TINGKAT DAN PEJABAT DUA TINGKAT DI ATAS LOT PT.50780 & PT. 50781, JALAN WAWASAN 4, KU 7, SUNGAI KAPAR INDAH INDUSTRIAL LAND, PHASE 1A2, MUKIM KAPAR, KLANG BANDAR DIRAJA, SELANGOR DARUL EHSAN (PILING WORKS) | 457,673.5 | 22-12-2010 TO 12-02-2011 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
MYDIN MOHAMAD HOLDINGS BERHAD | PROPOSED EARTHWORKS, PILING AND RETAINING WALL FOR CADANGAN PEMBANGUNAN YANG TERDIRI DARIPADA PASAR RAYA BORONG 3 TINGKAT DI ATAS SEBAHAGIAN LOT 31156, GRN 232702, BANDAR SEREMBAN UTAMA, DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS | 6,260,090.08 | 28-11-2011 TO 30-04-2012 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
SETIA HARUMAN SDN BHD/ JURUTERA PERUNDING TEKAD MAJU S/B | PILING AND PILECAP WORKS FOR "CADANGAN MEMBINA SEBUAH PUSAT PERNIAGAAN DI JALAN PERDANA, PERSIARAN CYBERPOINT TIMUR, CYBERJAYA | 4,902,033 | 21-02-2012 TO 20-07-2012 |
ATURAN PRISMA SDN BHD/ IRCON INTERNATIONAL LTD/ KLIA CONSULTANCY SERVICES SDN BHD | INFRASTRUCTURE WORKS OF TUNNEL BYPASS, SECTION 2A (KM500.400-KM506.558) FOR THE DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMISSIONING AND MAINTENANCE OF THE ELECTRIFIED DOUBLE TRACK PROJECT FROM SEREMBAN TO GEMAS | 6,4763,223.56 | 27-07-2009 TO 26-12-2012 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
SHEN YONG ENGINEERING WORKS SDN BHD/ SETIA RUNDING SDN BHD | R.C PILING WORKS FOR CADANGAN MEMBINA SEBUAH GUDANG DENGAN RUANG PEJABAT DI TINGKAT SATU DENGAN SEBUAH KEBUK SAMPAH DI ATAS LOT 22202 (PT. 17562), JALAN GAMBUS 33/4, SEKSYEN 33, 40400 SHAH ALAM, SELANGOR DARUL EHSAN UNTUK TETUAN GREAT AVENUE (M) SDN BHD (GUDANG LOGISTIK) | 3,939,902 | 26-02-2013 TO 30-04-2013 |
IRCON INTERNATIONAL LTD/ KLIA CONSULTANCY SERVICES SDN BHD | CONSTRUCTION, COMMISSIONING & MAINTENANCE OF KTMB STAFF QUARTES, SURAU, WORKSHOPS, STORES, ADMINSTRATIVE OFFICE, SPORTS FACILITIES ETC ALONG WITH ASSOCIATED STRUCTURES & SERVICES INCLUDING SITE CLEARANCE, CIVIL & STRUCTURAL WORKS, M & E WORKS AND EXTERNAL SERVICES | 35,232,432.89 | 07-04-2011 TO 30-07-2013 |
JVMC CORPORATION SDN BHD/ PERUNDING SPCE | PROPOSED PILING WORKS FOR :- DEVELOPMENT OF MUAR/MANIPAL MEDICAL COLLEGE ON LOT 80, 81, & 82, BANDAR PARIT BUNGA, MUKIM KESANG, DAERAH LEDANG, JOHOR DARUL TAKZIM FOR M/S JVMC CORPORATION SDN BHD | 4,413,657.94 | 02-08-2013 TO 30-11-2013 |
SHEN YONG ENGINEERING WORKS SDN BHD | PILING WORKS FOR :- CADANGAN PEMBINAAN YANG MENGADUNGI 36 UNIT KILANG KLUSTER 1 TINGKAT DENGAN PEJABAT TINGKAT MEZZANINE (PLOT 48 HINGGA PLOT 63, PLOT 66 HINGGA PLOT 85), 3 UNITS PENCAWANG ELEKTRIK (DOUBLE CHAMBER) DI ATAS SEBAHAGIAN PTD 106685 (PHASE A), MUKIM KULAI, DAERAH KULAI JAYA, JOHOR DARUL TAKZIM | 599,912 | 12-12-2013 TO 25-01-2014 |
SIGMAL CONSTRUCTION SDN BHD | PILING WORKS FOR :- CADANGAN PEMBANGUNAN 360 UNIT RUMAH KOS SEDERHANA DI ATAS NO.6 (PT. 29588), JALAN SETIA PERDANA U13/28, SHAH ALAM SEKSYEN U13, 40170 SHAH ALAM, SELANGOR DARUL EHSAN, UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR DAN EQUATORIAL SDN BHD | 1,545,000 | 16-12-2013 TO 28-02-2014 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
KAWAN FOOD MANUFACTURING SDN BHD/PERUNDING JES | SPUN PILING WORKS FOR :- CADANGAN MEMBINA SEBUAH KILANG MAKANAN/SEJUK BEKU 2 TINGKAT DAN PEJABAT 3 TINGKAT DI ATAS PT.129351 (LOT 96), JALAN SUNGAI PINANG 4/8, FASA 2C, MUKIM KLANG, KAWASAN PERINDUSTRIAN PULAU INDAH, DAERAH KLANG, KLANG SELATAN (KS 11), KLANG BANDAR DIRAJA, SELANGOR DARUL EHSAN UNTUK TETUAN KAWAN FOOD MANUFACTURING S/B | 8,350,000 | 10-02-2014 TO 30-05-2014 |
ACCOLADE LAND SDN BHD/ SETIA RUNDING SDN BHD | TUNNEL WORKS FOR SUB-STRUCTURE WORKS FOR :- CADANGAN PEMBANGUNAN PERDAGANGAN DAN KEDIAMAN YANG MENGANDUNGI 4 BLOK 6 TINGKAT KOMPLEKS PERDAGANGAN, 1 BLOK 10 TINGKAT PEMBANGUNAN PEJABAT DAN PERDAGANGAN DAN 1 BLOK 6 TINGKAT BANGUNAN BILIK PAMERAN DI ATAS LOT 38026, 38028, 38029, 38031, 38032, 38033, 38034 & SEBAHAGIAN TANAH KERAJAAN (REZAB JALAN), BATU 6, OFFJALAN CHERAS, MUKIM PETALING, DAERAH KUALA LUMPUR WILIYAH PERSEKUTUAN | 1,522,957 | 28-03-2014 TO 28-06-2015 |
KAWAN FOOD MANUFACTURING SDN BHD/ ALIRAN DESIGN SDN BHD | FENCING WORKS FOR :- CADANGAN MEMBINA SEBUAH KILANG MAKANAN/SEJUK BEKU 2 TINGKAT DAN PEJABAT 3 TINGKAT DI ATAS PT. 129351 (LOT 96), JALAN SUNGAI PINANG 4/8, FASA 2C, MUKIM KLANG, KAWASAN PERINDUSTRIAN PULAU INDAH, DAERAH KLANG, KLANG SELATAN (KS 11), KLANG BANDAR DIRAJA, SELANGOR DARUL EHSAN. | 543,268.59 | 18-06-2014 TO 06-09-2014 |
SHEN YONG ENGINEERING WORKS SDN BHD/ GNL ENGINEERING CONSULTANCY | PILING WORKS FOR :- CADANGAN MEMBINA 1 BLOK BANGUNAN PERDAGANGAN 12 TINGKAT YANG MENGANDUNGI 2 TINGKAT RUANG TEMPAT LETAK KERETA TERMASUK SATU TINGKAT SUB BESMEN, 2 TINGKAT PUSAT PERUBATAN SWASTA, 2 TINGKAT PEJABAT DOKTOR '(24 UNIT), 2 TINGKAT BILIK WARD (63 KATIL), 4 TINGKAT NURSING HOME' (88 UNIT), 1 TINGKAT RUANG KEMUDAHAN BANGUNAN ATAS ARAS BUMBUNG DI ATAS LOT PT 1850 KAWASAN BANDAR VI, DAERAH MELAKA TENGAH, MELAKA UNTUK TETUAN DAMAI RESIDENCE SDN BHD | 1,600,756 | 14-05-2014 TO 20-08-2014 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
ACCOLADE LAND SDN BHD/ SETIA RUNDING SDN BHD | PILING AND SUB-STRUCTURE WORKS FOR :- CADANGAN PEMBANGUNAN PERDAGANGAN DAN KEDIAMAN YANG MENGANDUNGI 4 BLOCK 6 TINGKAT KOMPLEKS PERDAGANGAN, 1 BLOK 36 TINGKAT BANGUNAN PEJABAT DAN PERDAGANGAN DAN 1 BLOK 6 TINGKAT BANGUNAN BILIK PAMERAN DI ATAS LOT 38026, 38028, 38029, 38031, 38032, 38033, 38034 & SEBAHAGIAN TANAH KERAJAAN (REZAB JALAN), BATU 6, OFF JALAN CHERAS, MUKIM PETALING, DAERAH KUALA LUMPUR. | 42,593,258.1 | 27-04-2012 TO 26-12-2014 Extended to 26-03-2015 |
HLGS SDN BHD/ PERUNDING JURU KHIDMAT | CADANGAN MEMBINA SEBUAH GUDANG SETINGKAT (MENYIMPAN RANGKA BESI KILANG) DENGAN PEJABAT 3 TINGKAT DI ATAS LOT 130451 (PT. 119972), JALAN CANANG EMAS 7/KS10, TELOK GONG, KLANG SELATAN (KS 10), MUKIM KLANG, DAERAH KLANG, KLANG BANDAR DIRAJA, SELANGOR DARUL EHSAN UNTUK TETUAN HLGS SDN BHD | 6,000,519.32 | 02-10-2014 TO 26-05-2015 |
99SPEEDMART SDN BHD / AEON ARCHITECT | CADANGAN MEMBINA SEBUAH BANGUNAN PEJABAT 12 TINGKAT DI ATAS PT2811 (HSD110331), BANDAR KLANG, (KU1) MUKIM BUKIT RAJA, KLANG BANDAR DIRAJA, SELANGOR DARUL EHSAN UNTUK TETUAN 99SPEEDMART SDN BHD. | 14,191,378.32 | 12-08-2013 TO 15-03-2015 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
SHEN YONG ENGINEERING WORKS SDN BHD | PILING WORKS FOR :- CADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS BANGUNAN GUDANG SESEBUAH 2 TINGKAT SEDIADA DAN BANGUNAN PEJABAT SESEBUAH 1 TINGKAT SEDIADA (MEROBOH DAN MEMBINA SEMULA) DI ATAS PT 2809 DAN LOT 13304, MUKIM BUKIT BARU, KAWASAN PERINDUSTRIAN BATU BERENDAM, DAERAH MELAKA TENGAH, MELAKA UNTUK TETUAN CONTRAVES SDN BHD | 509,865.5 | 26-03-2016 TO 28-04-2016 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
SEAL PROPERTIES (KL) SDN BHD | PILING AND SUB-STRUCTURE WORKS FOR :- CADANGAN MEMBINA DAN MENYIAPKAN PEMBANGUNAN PERDAGANGAN BERCAMPUR (FASA 1) YANG MENGANDUNGI:- (1) 1 BLOK (D) PEJABAT 6 TINGKAT (33 UNIT) (2) 3 BLOCK (E, F & G) PEJABAT 8 TINGKAT (480 UNIT) DIATAS 1 BLOK (PODIUM) (3) 3 DAN 4 TINGKAT KEDAI (170 UNIT) (4) 3 TINGKAT TEMPAT LETAK KERETA BERTINGKAT (5) 1 TINGKAT TEMPAT LETAK KERETA SEPARA BAWAH TANAH (6) 1 TINGKAT TEMPAT LETAK KERETA BAWAH TANAH DIATAS SEBAHAGIAN LOT PT 9149, JALAN SRI PERMAISURI, BANDAR SRI PERMAISURI, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK TETUAN PROJEK PENSWASTAAN DATUK BANDAR KUALA LUMPUR DENGAN DWITASIK SDN BHD | 66,967,420.7 | 10-04-2015 TO 30-03-2017 |
KONG LONG HUAT CHEMICALS SDN BHD / KH CONSULTANTS PLT | CADANGAN TAMBAHAN SEBUAH GUDANG 1 TINGKAT (BLOK B) BERSERTA PAJABAT 2 TINGKAT DI ATAS SEBAHAGIAN LOT 8907, JALAN TELOK GONG, MUKIM KLANG, KS 10, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN KONG LONG HUAT CHEMICALS SDN BHD. | 5,028,000 | 01-07-2017 TO 30-04-2018 |
KONG LONG HUAT CHEMICALS SDN BHD / PETAREKA PERUNDING (M) SDN BHD | PROPOSED CHEMICALS TANK FARM ON LOT 102739 (PN96003), JALAN PERIGI NENAS 6/1, KS11, TAMAN PERINDUSTRIAN PULAU INDAH, 42920 PULAU INDAH, WEST PORT, SELANGOR DARUL EHSAN UNTUK TETUAN KONG LONG HUAT CHEMICALS SDN BHD | 9,100,000 | 01-07-2017 TO 31-12-2018 |
Client/ Consultant Engineer | Project | Value of Contract (RM) | Period of Completion |
---|---|---|---|
RAMLY FOOD INDUSTRIES SDN BHD / JM - JURUTERA PERUNDING SDN BHD | CADANGAN MENDIRIKAN SESEBUAH KILANG YANG MENGANDUNGI KILANG DI TINGKAT BAWAH DAN PEJABAT DI TINGKAT SATU DI ATAS LOT 140909 (PT125500), LOT 140910 (PT125507), LOT 140911 (PT125501), LOT 140912 (PT125508) DAN LOT 140913 (PT125509), JALAN SUNGAI PINANG 4/6, TAMAN PERINDUSTRIAN PULAU INDAH FASA 2, MUKIM KLANG, DAERAH KLANG, KLANG BANDAR DIRAJA, SELANGOR DARUL EHSAN UNTUK TETUAN RAMLY FOOD INDUSTRIES SDN BHD. | 170,641,000 | 28-09-2015 TO 10-01-2019 |
IKEA SUPPLY (MALAYSIA) SDN BHD | CADANGAN PEMBANGUNAN PERINDUSTRIAN YANG MENGANDUNGI: I) I UNIT GUDANG (1 TINGKAT), II) I UNIT PEJABAT (2 TINGKAT), III) 1 UNIT PONDOK PENGAWAL DI ATAS SEBAHAGIAN LOT 104621 (LOT 59), JALAN SUNGAI PINANG 4/1/KS11, TAMAN PERINDUSTRIAN PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN IKEA SUPPLY (MALAYSIA) SDN BHD. WORK PACKAGE : EARTHWORK, GROUND IMPROVEMENT WORK AND PILING WORK. | 51,687,000 | 01-10-2018 TO 30-06-2019 |